Veles, Macedonia
Investor - Government of Macedonia - Ministry of Culture
66 years after its first play on the old stage of this Theatre and nearly 8 years since the start of activities on the development of project documentation and building preparation, the new Drama Theatre was opened with an official ceremony in June 2014.
Svetlost Teatar equipped this stage area with the modular Under machinery system, so the orchestra platform and the first two stage platforms consist of three modules 3.3mx4.1m, 9 modules in total, movement speed 0-0.6m/min. Two Stage platforms 2mx10m are located behind this plan. Transport platform 6.5mx4.5m, platform travel 6.72m. Stage platforms travel 5m.
The upper machinery is equipped with 34 scenery hoists, Steel fireproof curtain, ceremonial curtain with horizontal and vertical drive, gantry and two lighting bridges, 6 lighting hoists, 1 lighting bridge in the auditorium, 4 point hoists, management system.
Other systems – Stage lighting System for the big and small Stage, Audio system, Video projector system, Ceremonial curtain – hand-embroidered according to the design of the Architect Ilija Stjčevski, stage curtains, stage floor, dance floor, mobile podiums, touring equipment.
The 2014/2015 season was opened in December 2014, with the comedy “The most important thing in the world“ by the director Lj. Georgijevski.